What does Scheduled Tasks Last Result Code 0x2 mean?

Discussion in 'Software' started by Bear7535, Apr 27, 2004.

  1. Bear7535

    Bear7535 Private E-2

    I'm running a pre-backup job using Scheduled Tasks and continue to receive a Last Result code of 0x2. The script is written to shut down Oracle, backup up the cold database, and then restart Oracle. This is a production server and I'm afraid the 0x2 code means its either failing or completing with exceptions. I know 0x0 is a successful backup but for some reason I can't find a list of Last Result codes for Scheduled Tasks in Windows Help or even in Google!

    Any help would be greatly appreciated.

    Thanks in advance.
     
  2. Adrynalyne

    Adrynalyne Guest


MajorGeeks.Com Menu

Downloads All In One Tweaks \ Android \ Anti-Malware \ Anti-Virus \ Appearance \ Backup \ Browsers \ CD\DVD\Blu-Ray \ Covert Ops \ Drive Utilities \ Drivers \ Graphics \ Internet Tools \ Multimedia \ Networking \ Office Tools \ PC Games \ System Tools \ Mac/Apple/Ipad Downloads

Other News: Top Downloads \ News (Tech) \ Off Base (Other Websites News) \ Way Off Base (Offbeat Stories and Pics)

Social: Facebook \ YouTube \ Twitter \ Tumblr \ Pintrest \ RSS Feeds